> It was mentioned during the launch that current datacenter requires up to 0.25 gigawatts of power. The datacenter they're currently building will require 1.25 (5x) (for reference, a nuclear powerplant might output about 1 gigawatt).
IIRC achieving full AGI requires precisely 1.21 jigawatts of power, since that's when the model begins to learn at a geometric rate. But I think I saw this figure mentioned in a really old TV documentary from the 1980s, it may or may not be fully accurate.
IIRC achieving full AGI requires precisely 1.21 jigawatts of power, since that's when the model begins to learn at a geometric rate. But I think I saw this figure mentioned in a really old TV documentary from the 1980s, it may or may not be fully accurate.